We have date fields throughout our bsv with MM/dd/yyyy as the format. If when the user is filling out the field they enter for example: 01/06/16 and tab out of the field it will default to 01/06/1916.
I am assuming a Date attribute type stores in the database the same way and that the format specification is simply for display and entry (i.e. the above looks like 2016-01-06 in the database). It would do me no good to switch all of the date attribute formats to MM/dd/yy to resolve this issue.
Is there someplace else I can go to correct the default from 1900 to 2000?